Refurbishment of the Redundant Building

It took 2 months to refurbish the old redundant building.  In the past it had been a stable, a farm shop and then left to collect junk from the nursery.  So I repainted the exterior weatherproofing (the windows had 2 coats of gloss), Geoff repaired the roof, guttering, missing slats and installed new plaster board internally.  Then it was the task of repainting the interior,  including scrubbing and painting the floor.  But I think it was worth it.  Check out the before and after photos:




1 comment:

  1. Wow .. It looks great! Hopefully I can pop in soon to see you! Xxxxxx

    ReplyDelete